Sale!

General Arrangement of Important Bridge Over River Yamuna

0.00

Only Registered Users can Download this Product. If You not Registered or Logined. then

Login Now  or    Register/ Sign UP

Description

Loading

Name of File :- General Arrangement of Important Bridge Over River Yamuna

Name of Project :- Dedicated Freight Corridor Corporation of India Ltd.

Notes:-

    1. All Dimensions Are in Millimeters and Levels Are in Meters Unless Noted Otherwise,
    2. Only Written Dimensions Are to Be Followed, dimensions Are Not to Be Scaled.
    3. This Bridge Has Been Designed for DFCC Loading (32.5 Ton for Axle Load)
    4. For Location of Bridge Refer Railway Alignment Plan.
    5. For Sections & Details Refer Separate Drawings.

Hydraulic Data:-

    1. Design Discharge ………..,..,……… 56000 CUMEC
    2. High Flood Level (HFL) ………,…. .RL. 90.370 M
    3. Low Water Level (LWL) RL…………74.00m
    4. Maximum Scour Level (MSL) …,….RL. 48.580m

Structural and Other Data:-

    1. Span Arrangement ………..21×49.24m=1034.04m
    2. Type of Foundation
      Piers……………………………circular Well
      Abutment……………………..circular Well
    3. Sub Structure……………….R.C,C. Piers & Wall
      Type R.C.C. Abutment
    4. Bearings……………………..pot, Pot. ptfe Bearings
    5. Super Structure…, ……….through Type Steel Truss.
    6. Footpath……………………..steel Footpath With Checkered Plate

Concrete:-

    1. Bottom Plug………………………………………………………m25 (Cement Content as Per Specification)
    2. Top Plug……………,,.,..,.,,.,..,, ………………………………….M25
    3. Well Staining and Curb,., ……………………………………M35 (Cement Content as Per Specification)
    4. Well Cap..,,………………………………………………………….M35
    5. Pier & Pier Cap…………………………………………………….m40
    6. Bearing Pedestals and Seismic Reaction Block………..m40
    7. Abutment & Abutment Foundation…………………………..m40
    8. Return Wall ,,.,..,.,,., …,..,….,.,,.,….,..,………………………. M40
    9. Leveling Course :…………………………………………………..m15
      I) Below Approach Slab .,,., ….,,…………………………….., M15
      Ii) Below Abutment Foundation ,… …………………………..1:3:6
    10. Approach Slab……………………………………………………….m35

Reinforcement Steel:-

    1. H.Y.S.D, Bars .,..,…………………………………………………… Grade Fe500 Conforming to Is 1786

Structural Steel :-

    1. All Structural Steelwork (Fabrication & Erection) Shall Conform to IRS Steel Bridge Code
    2. All Structural Steel Shall Conform to Ls:2062-2006 E-410 (Fe 540)
    3. Electrodes for Weld Shall Conform to Is:814.
    4. All Bolts Used in the Permanent Steelwork for This Project Shall Conform to Ls:1367.
    5. All Structural Steelwork Shall Be Painted With One Priming Coat of Red Lead Primer as Per Ls:102 at Shop and One More Coat of Red Lead Primer & Two Coats of Aluminum Paint Conforming to Ls:2339 at Site,
    6. For Fabrication Details Refer Separate Draw | ngp
    7. Arrangement of Lacing/bracing Not Shown Here for This Refer Separate Drawing.

Additional information

Product Name

General Arrangement of Important Bridge Over River Yamuna

Product Size

1.92 MB

Format

File Format

DEPARTMENT/COURSE

File Category

Need For

Bridge, Bridge Designing, CAD Engineering, Softweres

Product Type

Provided By

Bush RC (NIT Agartala)

Uploaded By

Roop Chandra

Languages

English

Reviews

There are no reviews yet

Add a review
General Arrangement of Important Bridge Over River Yamuna General Arrangement of Important Bridge Over River Yamuna
Rating*
0/5
* Rating is required
Your review
* Review is required
Name
* Name is required
Add photos or video to your review
No more offers for this product!

You may also like…