Sale!

Material Requirements For Civil Work Design Excel Sheet with Shortcut Key’s (Based on IS Code)

69.00

6.90 Cashback

Description

Loading

Name of File :- Material Requirements For Civil Work Design Excel Sheet with Shortcut Key’s (Based on IS Code)

Content:-

  • Sheet No-1 Bar Bending Schedule
  • Sheet No-2 MAIN BUILDING (Items)
  • Sheet No-3 Requirement of Material(in MKS And FPS System)
  • Sheet No-4 Requirement of Material and Labor(MKS)
  • Sheet No-5 Bar Weight (Imperial Sizes)
  • Sheet No-6 ITEM WISE BREAKDOWN FOR ANY QAUNTITY

MAIN BUILDING

  • Excavation in foundation of building, bridges etc complete : In ordinary soil
  • Plain Cement Concrete incl. placing, compacting, finishing & curing (Ratio 1:4:8) in foundation
  • Plain Cement Concrete incl. placing, compacting, finishing & curing (Ratio 1:2:4)
  • Damp proof of cem. conc. 1:2:4 i/c bitumen coat, 1 layer polythene & 1 coat bitumen (2″ thick)
  • Pacca brick work in foundation and plinth in Cement, sand mortar 1:6
  • Pucca brick work in ground floor Cement, sand mortar 1:6 upto Lintel Level
  • Pucca brick work in ground floor Cement, sand mortar 1:4
  • Extra labour for first floor (columns)
  • Extra labour for first floor (B.B work)
  • RCC (1:2:4) in Slab, Lintel and shades
  • Extra labour for first floor (RCC)
  • Extra labour for arch work in brick masonry, including labour for centring and decentring
  • Single layer of tiles 10″x5″x1.25″ laid over 4″ earth and 1″ mud plaster on top of RC roof slab
  • P&L of polythene sheet on roof
  • Khuras on roof 2’x2’x6″
  • Bottom khuras of brick masonry in c/s mortar 1:6,4’x2’x4.5″ over 3″ cem. concrete 1:4:8
  • Cement plaster 1:4 upto 20′ height 1/2″ thick
  • Cement pointing struck joints, on walls, upto 20′ height : Ratio 1:3
  • Filling, watering and ramming earth under floor with surplus earth from foundation, etc
  • Supplying and filling sand under floor or plugging in wells
  • Brick Ballast or shingle under floor
  • Excavation in foundation of building, bridges etc complete : In ordinary soil
  • Plain Cement Concrete incl. placing, compacting, finishing & curing (Ratio 1:4:8) in foundation
  • Plain Cement Concrete incl. placing, compacting, finishing & curing (Ratio 1:2:4)
  • Damp proof of cem. conc. 1:2:4 i/c bitumen coat, 1 layer polythene & 1 coat bitumen (2″ thick)

Requirement of Material(in MKS And FPS System)

  • RCC/PCC
  • P.C.C(1:4:8)
  • P.C.C(1:3:6)
  • P.C.C/R.C.C(1:2:4)
  • P.C.C/R.C.C(1:1.5:3)
  • P.C.CR.C.C(1:1:2)
  • Burnt Brick (Cement Sand Mortar)
  • Brick Cement Mortar(1:6)
  • Brick Cement Mortar(1:5)
  • Brick Cement Mortar(1:4)
  • Brick Cement Mortar(1:3)
  • Plastering/Pointing
  • Cement plaster (1:6) 1/2″ thick(12mm)
  • Cement plaster(1:5)1/2″ thick(12mm)
  • Cement plaster(1:4)1/2″ thick (12mm)
  • Cement plaster(1:3)1/2″ thick(12mm)
  • Cement plaster(1:2)1/2″ thick(12mm)
  • Cement plaster (1:6) 3/4″ thick(20mm)
  • Cement plaster(1:5)3/4″ thick(20mm)
  • Cement plaster(1:4)3/4″ thick(20mm).
  • Cement plaster(1:3)1/2″ thick(20mm)
  • Cement plaster(1:2)3/4″ thick(20mm)
  • Ceiling plaster(1:3)1/2″ thick(12mm)
  • Ceiling plaster(1:4)1/2″ thick(12mm)
  • Ceiling plaster(1:3)1/4″ thick(6mm)
  • Ceiling plaster(1:4)1/4″ thick(6mm)
  • Cement pointing (1:3)
  • Cement pointing (1:2)
  • DPC
  • D.P.C. 1:2:4 (2″ thick)
  • D.P.C. 1:1.5:3( 1″ thick/2.5cm)
  • Flooring
  • 2″(5cm)Thick PCC Floor (1:2:4)
  • 2″(5cm)Thick PCC Floor (1:2:4)
  • 4″ Thick PCC(1:4:8)
  • Brick Tiles(10″x5″x1.25″)
  • Brick Tiles(10″x5″x1.25″)

Requirement of Material and Labor(MKS)
Bar Weight (Imperial Sizes)

  • Particular of Item
  • Excavation In Ordinary Soil
  • Excavation In Hard Soil
  • BB Work in Cement Mortar in Foundation and Plinth
  • BB work in Super Structure
  • R.B Work
  • Plastering
  • Pointing
  • Floor Topping
  • PCC
  • RCC
  • Shuttering
  • Filling/Compacting of Earth under Floor
  • Sand Cushion Under floor
  • Brick Ballast under floor
  • DPC
  • Brick laid by Mason
  • Brick laid by Mason in foundation
  • Steel Fixing
  • Paint Enamel
  • Paint Emulsion
  • Electrification

ITEM WISE BREAKDOWN FOR ANY QAUNTITY
Description of items

  • P C C (1:4:8)
  • P C C (1:2:4)
  • Bricks works(1:4CSM)
  • Bricks works(1:3CSM)
  • Bricks works(1:6CSM)
  • Steel 1/2″ dia
  • Steel 3/8″ dia
  • Brick Tiles(10″X5″X1.25″)
  • Bitumen’s 10/20 Grade
  • Polthyene Sheet 100Gauge
  • DPC (1:2:4)
  • Mud
  • Cement Plaster 1/2″ thick(1:3csm)
  • Cement Plaster 1/2″ thick(1:6 csm)
  • Coping (1:3:6)
  • Floor PCC1:2:4
  • Struck pointing (1:3 csm)
  • 1/2″ Skirting (1:2 csm)

Additional information

Product Name

Material Requirements For Civil Work Design Excel Sheet with Shortcut Key's

Product Size

135 KB

Format

File Format

File Category

DEPARTMENT/COURSE

Need For

Building Design, Softweres

Product Type

Provided By

Bush RC (NIT Agartala)

Uploaded By

Roop Chandra

Languages

English

Reviews

There are no reviews yet

Add a review
Material Requirements For Civil Work Design Excel Sheet with Shortcut Key's (Based on IS Code) Material Requirements For Civil Work Design Excel Sheet with Shortcut Key's (Based on IS Code)
Rating*
0/5
* Rating is required
Your review
* Review is required
Name
* Name is required
Add photos or video to your review
No more offers for this product!