Question No.01 Cast-iron piles
- (A) Are suitable for works undersea water
- (B) Resist shocks or vibrations
- (C) Are suitable for use as batter piles
- (D) Are useful for heavy vertical loads
Answer: Option D
Question No.02 The formwork from the slabs excluding props, can be removed only after
- (A) 1 day
- (B) 4 days
- (C) 7 days
- (D) 14 days
Answer: Option B
QuestionNo.03 The process of filling hollow spaces of walls before plastering, is known
- (A) Hacking
- (B) Dubbing out
- (C) Blistering
- (D) Peeling
Answer: Option B