Question No.01 Cast-iron piles

  • (A) Are suitable for works undersea water
  • (B) Resist shocks or vibrations
  • (C) Are suitable for use as batter piles
  • (D) Are useful for heavy vertical loads

Answer: Option D

Question No.02 The formwork from the slabs excluding props, can be removed only after

  • (A) 1 day
  • (B) 4 days
  • (C) 7 days
  • (D) 14 days

Answer: Option B

QuestionNo.03 The process of filling hollow spaces of walls before plastering, is known

  • (A) Hacking
  • (B) Dubbing out
  • (C) Blistering
  • (D) Peeling

Answer: Option B