Name of File :- Longitudinal Elevation of Bridge Over River Yamuna
Plan Feature :- Plan of TOP Level
Name of Project :- Dedicated Freight Corridor Corporation of India Ltd.
Notes:-
-
- All Dimensions Are in Millimeters and Levels Are in Meters Unless Noted Otherwise,
- Only Written Dimensions Are to Be Followed, dimensions Are Not to Be Scaled.
- This Bridge Has Been Designed for DFCC Loading (32.5 Ton for Axle Load)
- For Location of Bridge Refer Railway Alignment Plan.
- For Sections & Details Refer Separate Drawings.
Hydraulic Data:-
-
- Design Discharge ………..,..,……… 56000 CUMEC
- High Flood Level (HFL) ………,…. .RL. 90.370 M
- Low Water Level (LWL) RL…………74.00m
- Maximum Scour Level (MSL) …,….RL. 48.580m
Structural and Other Data:-
-
- Span Arrangement ………..21×49.24m=1034.04m
- Type of Foundation
Piers……………………………circular Well
Abutment……………………..circular Well - Sub Structure……………….R.C,C. Piers & Wall
Type R.C.C. Abutment - Bearings……………………..pot, Pot. ptfe Bearings
- Super Structure…, ……….through Type Steel Truss.
- Footpath……………………..steel Footpath With Checkered Plate
Concrete:-
-
- Bottom Plug………………………………………………………m25 (Cement Content as Per Specification)
- Top Plug……………,,.,..,.,,.,..,, ………………………………….M25
- Well Staining and Curb,., ……………………………………M35 (Cement Content as Per Specification)
- Well Cap..,,………………………………………………………….M35
- Pier & Pier Cap…………………………………………………….m40
- Bearing Pedestals and Seismic Reaction Block………..m40
- Abutment & Abutment Foundation…………………………..m40
- Return Wall ,,.,..,.,,., …,..,….,.,,.,….,..,………………………. M40
- Leveling Course :…………………………………………………..m15
I) Below Approach Slab .,,., ….,,…………………………….., M15
Ii) Below Abutment Foundation ,… …………………………..1:3:6 - Approach Slab……………………………………………………….m35
Reinforcement Steel:-
-
- H.Y.S.D, Bars .,..,…………………………………………………… Grade Fe500 Conforming to Is 1786
Structural Steel :-
-
- All Structural Steelwork (Fabrication & Erection) Shall Conform to IRS Steel Bridge Code
- All Structural Steel Shall Conform to Ls:2062-2006 E-410 (Fe 540)
- Electrodes for Weld Shall Conform to Is:814.
- All Bolts Used in the Permanent Steelwork for This Project Shall Conform to Ls:1367.
- All Structural Steelwork Shall Be Painted With One Priming Coat of Red Lead Primer as Per Ls:102 at Shop and One More Coat of Red Lead Primer & Two Coats of Aluminum Paint Conforming to Ls:2339 at Site,
- For Fabrication Details Refer Separate Draw | ngp
- Arrangement of Lacing/bracing Not Shown Here for This Refer Separate Drawing.