Sale!

Material Requirements For Civil Work Design Excel Sheet with Shortcut Key’s (Based on IS Code)

Original price was: ₹129.00.Current price is: ₹69.00.

Description

Name of File :- Material Requirements For Civil Work Design Excel Sheet with Shortcut Key’s (Based on IS Code)

Content:-

  • Sheet No-1 Bar Bending Schedule
  • Sheet No-2 MAIN BUILDING (Items)
  • Sheet No-3 Requirement of Material(in MKS And FPS System)
  • Sheet No-4 Requirement of Material and Labor(MKS)
  • Sheet No-5 Bar Weight (Imperial Sizes)
  • Sheet No-6 ITEM WISE BREAKDOWN FOR ANY QAUNTITY

MAIN BUILDING

  • Excavation in foundation of building, bridges etc complete : In ordinary soil
  • Plain Cement Concrete incl. placing, compacting, finishing & curing (Ratio 1:4:8) in foundation
  • Plain Cement Concrete incl. placing, compacting, finishing & curing (Ratio 1:2:4)
  • Damp proof of cem. conc. 1:2:4 i/c bitumen coat, 1 layer polythene & 1 coat bitumen (2″ thick)
  • Pacca brick work in foundation and plinth in Cement, sand mortar 1:6
  • Pucca brick work in ground floor Cement, sand mortar 1:6 upto Lintel Level
  • Pucca brick work in ground floor Cement, sand mortar 1:4
  • Extra labour for first floor (columns)
  • Extra labour for first floor (B.B work)
  • RCC (1:2:4) in Slab, Lintel and shades
  • Extra labour for first floor (RCC)
  • Extra labour for arch work in brick masonry, including labour for centring and decentring
  • Single layer of tiles 10″x5″x1.25″ laid over 4″ earth and 1″ mud plaster on top of RC roof slab
  • P&L of polythene sheet on roof
  • Khuras on roof 2’x2’x6″
  • Bottom khuras of brick masonry in c/s mortar 1:6,4’x2’x4.5″ over 3″ cem. concrete 1:4:8
  • Cement plaster 1:4 upto 20′ height 1/2″ thick
  • Cement pointing struck joints, on walls, upto 20′ height : Ratio 1:3
  • Filling, watering and ramming earth under floor with surplus earth from foundation, etc
  • Supplying and filling sand under floor or plugging in wells
  • Brick Ballast or shingle under floor
  • Excavation in foundation of building, bridges etc complete : In ordinary soil
  • Plain Cement Concrete incl. placing, compacting, finishing & curing (Ratio 1:4:8) in foundation
  • Plain Cement Concrete incl. placing, compacting, finishing & curing (Ratio 1:2:4)
  • Damp proof of cem. conc. 1:2:4 i/c bitumen coat, 1 layer polythene & 1 coat bitumen (2″ thick)

Requirement of Material(in MKS And FPS System)

  • RCC/PCC
  • P.C.C(1:4:8)
  • P.C.C(1:3:6)
  • P.C.C/R.C.C(1:2:4)
  • P.C.C/R.C.C(1:1.5:3)
  • P.C.CR.C.C(1:1:2)
  • Burnt Brick (Cement Sand Mortar)
  • Brick Cement Mortar(1:6)
  • Brick Cement Mortar(1:5)
  • Brick Cement Mortar(1:4)
  • Brick Cement Mortar(1:3)
  • Plastering/Pointing
  • Cement plaster (1:6) 1/2″ thick(12mm)
  • Cement plaster(1:5)1/2″ thick(12mm)
  • Cement plaster(1:4)1/2″ thick (12mm)
  • Cement plaster(1:3)1/2″ thick(12mm)
  • Cement plaster(1:2)1/2″ thick(12mm)
  • Cement plaster (1:6) 3/4″ thick(20mm)
  • Cement plaster(1:5)3/4″ thick(20mm)
  • Cement plaster(1:4)3/4″ thick(20mm).
  • Cement plaster(1:3)1/2″ thick(20mm)
  • Cement plaster(1:2)3/4″ thick(20mm)
  • Ceiling plaster(1:3)1/2″ thick(12mm)
  • Ceiling plaster(1:4)1/2″ thick(12mm)
  • Ceiling plaster(1:3)1/4″ thick(6mm)
  • Ceiling plaster(1:4)1/4″ thick(6mm)
  • Cement pointing (1:3)
  • Cement pointing (1:2)
  • DPC
  • D.P.C. 1:2:4 (2″ thick)
  • D.P.C. 1:1.5:3( 1″ thick/2.5cm)
  • Flooring
  • 2″(5cm)Thick PCC Floor (1:2:4)
  • 2″(5cm)Thick PCC Floor (1:2:4)
  • 4″ Thick PCC(1:4:8)
  • Brick Tiles(10″x5″x1.25″)
  • Brick Tiles(10″x5″x1.25″)

Requirement of Material and Labor(MKS)
Bar Weight (Imperial Sizes)

  • Particular of Item
  • Excavation In Ordinary Soil
  • Excavation In Hard Soil
  • BB Work in Cement Mortar in Foundation and Plinth
  • BB work in Super Structure
  • R.B Work
  • Plastering
  • Pointing
  • Floor Topping
  • PCC
  • RCC
  • Shuttering
  • Filling/Compacting of Earth under Floor
  • Sand Cushion Under floor
  • Brick Ballast under floor
  • DPC
  • Brick laid by Mason
  • Brick laid by Mason in foundation
  • Steel Fixing
  • Paint Enamel
  • Paint Emulsion
  • Electrification

ITEM WISE BREAKDOWN FOR ANY QAUNTITY
Description of items

  • P C C (1:4:8)
  • P C C (1:2:4)
  • Bricks works(1:4CSM)
  • Bricks works(1:3CSM)
  • Bricks works(1:6CSM)
  • Steel 1/2″ dia
  • Steel 3/8″ dia
  • Brick Tiles(10″X5″X1.25″)
  • Bitumen’s 10/20 Grade
  • Polthyene Sheet 100Gauge
  • DPC (1:2:4)
  • Mud
  • Cement Plaster 1/2″ thick(1:3csm)
  • Cement Plaster 1/2″ thick(1:6 csm)
  • Coping (1:3:6)
  • Floor PCC1:2:4
  • Struck pointing (1:3 csm)
  • 1/2″ Skirting (1:2 csm)

Additional information

Product Name

Material Requirements For Civil Work Design Excel Sheet with Shortcut Key's

Product Size

135 KB

Format

File Format

File Category

DEPARTMENT/COURSE

Need For

Building Design, Softweres

Product Type

Provided By

Bush RC (NIT Agartala)

Uploaded By

Roop Chandra

Languages

English

Reviews

There are no reviews yet

Add a review
You must be logged in to post a review Log In
No more offers for this product!