If the shear utilization of the compression strut (VRd,max = concrete capacity) does not exceed 33% shear links (2) may be used. For higher shear utilization shear reinforcement (1) must be used. 90° hooks may not be used in surfaces exposed to fire with R90 (90min) requirement as a failure of the concrete cover may lead to anchorage failure of the shear link.